The specialty structural concrete pouring is a delicate process. A single mistake can negatively affect your project. When you pour structural concrete, various mistakes can occur at any point – from the initial design to the finishing touches.

These problems vary from place to place and project to project, but they all have one thing in common: they can cause significant headaches for the construction crew and lead to delays and costly mistakes if not dealt with quickly and adequately.

This post will discuss four of these common structural concrete pouring problems and how they can be avoided.

1. Improper Concrete Mix Design

This is a common mistake made during structural concrete pouring, and it can lead to significant issues if not corrected promptly. When creating the right mixture for your project, many factors need to be considered, including how much cement is used per cubic yard of aggregate (or “gravel”).

If you’re not getting the right amount of cement, your concrete can turn out weak and have a low strength – meaning you’ll have to pour more to get the results you want.

2. Using the Wrong Quantity of Water

When pouring concrete, too little or too much water can signify that you’re not using the right mixture. For example, if there is more than one percent surplus in cement per cubic yard, your mix may have excess water, which will promote cracking over time. This also means that the strength of your concrete may not be at the level you intended it to be.

You will need a right amount of water for the mix. This should produce a workable consistency without affecting the other ingredients in the mix too much.

3. Not Vibrating the Concrete Enough

Many amateur concrete professionals fail to vibrate their mix enough. This will cause pockets of air in your mixture, which may lead to cracking or reduced strength of your final product.

You should try shaking the mixture up and down as well as side-to-side when you’re mixing by hand or machine – whichever the case may be.

4. Not Pre-Wetting the Masonry

If you don’t pre-wet your masonry, it may not be able to hold onto the concrete mixture. This will affect how well they bond with each other and decrease the overall strength of your final product.

If possible, you should wet the masonry down before pouring your mix. This will allow it to absorb more of the water and cement in the mixture to set correctly without major issues.

Steelcon Builders serving Wilkesboro have ample experience pouring specialty structural concrete. Our team is well-versed in the best practices for pouring concrete. We know how to avoid these top four common mistakes. 

Let us help ensure your construction project turns out well by providing high-quality services and materials every time! Schedule an appointment today!